09/02/2012

1. Approbation of minutes of the previous meeting (08/12)

2. Feedback WG Belgian Grid

  • Evolution of the Grid Code: status of the works
  • Closed distribution systems: status of the works

3. Feedback ad-hoc Platform RES.

4. Any other business