10-12-2015

  1. Approval of the minutes (in French) from the Plenary User’s Group of 24/09/2015
  2. WG European Market Design
    1. Status of ongoing works (29/09)
    2. Network Codes - FCA 
  3. WG Belgian Grid Status of Ongoing works (9/10)
    1. Implementation of the network Codes – Experts Group
    2. Tariffs 2016-2019
  4. Task Force Strategic Reserve Implementation
    1. Status of ongoing works (8/10, 2/12)
    2. Results of the ELIA volume assessment report for winter 2016-2017
    3. Design (product & tender design)
  5. TF Balancing – status of ongoing works (12/10)
    1. R1 Cross-Border with Germany
    2. R3 Short Term Sourcing 2016: status
    3. Amendment of Billable Margin calculation
  6. Pilot project « Decrease of the Secondary Reserves for the wind parks – Presentation of the results
  7. Safety codes and outage plan (in Dutch)
  8. Flow based – First lessons
  9. Import capacities - Doel (in Dutch)
  10. Various
    1. Dates of the Users’Group meetings in 2016
    2. Discussion on the future organisation of the Users’ Group
    3. Reorganisation within ELIA