Tower crane with safety net to be installed at Huizingen station

On 25 May, Elia will begin installing a tower crane with a protective net at the station in Huizingen. This work will continue until Saturday 30 May
During this period, A. Vaucampslaan will be closed to all traffic between Kortestraat and J. van Laetstraat and parking will be prohibited in these streets. A diversion will be in place via Kortestraat and J. van Laetstraat.

Following installation of the crane, A. Vaucampslaan will be configured as a one-way street between Kortestraat and J. van Laetstraat. During this period, a diversion will be in place via Kortestraat, which will be accessible in both directions.

Read more about protective gantries here. (This document is currently only available in Dutch) 


This website uses cookies to provide you with an optimal browsing experience. Some cookies are strictly necessary for the operation of this website and cannot be rejected, while others are used for analytical/functional/targeting purposes and can be rejected, except for the cookies used to analyse the traffic. For more information, please consult ourCookie Policy . You can manage/change your cookie preferences at any time. If you do not manage your preferences, only the cookies which are strictly necessary will be accepted.