08 October 2025 E34 closed near Melsele during the night of October 8 to 9We are currently reinforcing the high-voltage line (380kV) between Liefkenshoek and the Mercator high-voltage substation in Kruibeke as part of the Brabo III project. Electricity cables have now been installed across the E34 near the entrance and exit complex in Melsele. 
- 
06 June 2025 E17 closed during the night between 10 and 11 JuneAs part of the Brabo III project, we are currently upgrading the high-voltage line (380 kV) between Liefkenshoek and the Mercator high-voltage substation in Kruibeke. To this end, during the night between 10 and 11 June we will erect two cranes over the E17 at the Haasdonk interchange. The motorway will consequently be closed between Sint-Niklaas and Kruibeke from 10.30 p.m. to 4 a.m. 
- 
06 March 2025 Brabo III entering a new phaseAfter completing the erection of many of the new pylons for the Brabo III project, a new phase started at the construction site: installation of the conductors for this new, 380-kilovolt overhead line. 
- 
06 November 2024 Highest pylon built in the Brabo III projectLast week, a new 132-metre pylon was built at the Kallosluis in Beveren. The second pylon here will follow in the next few months. 
- 
02 April 2024 Next phase begins: first pylon installed in KalloOn 25 March, Elia installed in Kallo (Beveren) the first high-voltage pylon for the new 380-kV high-voltage Liefkenshoek–Mercator line in Kruibeke. As part of the Brabo III project, this is the first in a long line of 58 new pylons that will prepare the port of Antwerp and Waasland for the energy transition and enable our country to exchange more electricity with the Netherlands. 
- 
06 December 2023 Traffic disruption expected on E17 between Sint-Niklaas and Kruibeke due to night-time dismantling work on the high-voltage lineElia (the system operator) is currently reinforcing the high-voltage line (380 kV) between Liefkenshoek and the Mercator high-voltage substation in Kruibeke as part of the Brabo III project. Because of this work, the E17 at slip-road complex 15 and 16 in Sint-Niklaas and Kruibeke will be closed between 11 p.m. and 4 a.m. on the night of 8 to 9 December 2023. 
- 
03 October 2023 Heavy traffic disruption expected on E34 in Beveren, due to night-time dismantling work on the high-voltage lineThe system operator, Elia, is currently reinforcing the high-voltage line (380kV) between Liefkenshoek and the high-voltage substation Mercator in Kruibeke as part of the Brabo III project. For these works, the E34 at the slip road complex 9 in Beveren will be completely closed between 11 p.m. and 4 a.m. for two nights in October. 
- 
06 September 2023 Work begins on Liefkenshoek–Mercator high-voltage line (380kV)Elia is upgrading the Liefkenshoek–Mercator (Kruibeke) high-voltage line. In late August Elia will begin taking down the existing high-voltage line (150kV) and will later build a new, upgraded high-voltage line (380kV) in the same location. To support the heavier lines, Elia is replacing 58 high-voltage pylons with new ones. The new masts will look virtually the same as they do today. 
- 
19 June 2023 Successful commissioning of Kallo-Beveren-Waas underground cableThe underground cable connection between the high-voltage substations of Kallo and Beveren Waas was successfully started up this week. With it, all cable works of the Brabo III project were completed and the line work can start shortly. 
- 
27 October 2022 Start of work in the Lisdodde nature reserveFrom November, system operator Elia will start reinforcing and renewing the high voltage line Liefkenshoek-Mercator (380 kV). The works take place within the framework of Brabo III. The high-voltage line runs partly through the Lisdodde nature reserve. Elia carries out the necessary trimming and felling activities to ensure that the work is done safely. 
- 
05 August 2022 Laying of underground electrical cablesfinalisedIn 2021, Elia started laying underground cables (150 kV) between the high-voltage substations of Kallo and Fort Sint-Filips and Beveren-Waas. This work has now been completed. Elia is currently conducting the necessary safety tests so that these cables can be taken into service. 
- 
17 August 2021 Start of public consultation for an environmental permitPublic consultationElia has submitted a permit application to upgrade the existing high-voltage line between Liefkenshoek and Kruibeke. The application was declared complete by the Flemish government on 9 August 2021. The public consultation will begin on Thursday, 19 August 2021 and run until Friday, 17 September 2021. 
- 
07 October 2020 More than 60 people attend information sessions in BeverenTwo information sessions for the Brabo III project were held on 29 and 30 September, entirely in accordance with the precautions for combating the coronavirus (COVID-19). More than 60 local residents visited the information session to find out about the project. 
- 
06 October 2020 Brabo III in pictures via handy digital appElia has developed a Project Atlas as part of the Brabo III project. This is a visualisation on a map showing the current and future situation around the high-voltage Liefkenshoek-Mercator line that is going to be upgraded.
- 
09 April 2020 Everything you always wanted to know about Brabo III in a handy brochureKeen to find out more about Brabo III? Our brochure entitled Makkelijker elektriciteit importeren en exporteren (Importing and exporting electricity more easily – available in Dutch only) provides a clear overview of the three subprojects and the kind of work being performed